Drama

It is a small town in north-Eastern Greece and the place where I live.

Drama11
Drama11
« 1 της 10 »

TBL and PBL: Two Learner-centred Approaches

An interesting article I have come up about TBL and PBL.  Really worth reading it.

TBL

TBL and PBL: Two learner-centred approaches

Many newly qualified or inexperienced teachers tend to base their lesson planning on the traditional PPP approach (Presentation, Practice, Production) because it is reliable and it is a valid framework around which to base a series of classroom activities.

It is also usually the best way of covering all the lexical areas and grammar points in the course book or syllabus. All good and well. The problem is that PPP serves the teacher?s needs but it is debatable whether or not it fulfills the needs of the learner.

The language presented and practiced does not take into account the particular needs of each learner; the language content is almost always dictated by the coursebook and/or syllabus. For this reason, many teachers, having experimented with the PPP approach turn to more learner-centred approaches where the needs of the learner are central to the lesson content. Two such approaches are TBL (Task-Based Learning) and PBL (Project-Based Learning).

What is TBL?

In task-based learning, the central focus of the lesson is the task itself, not a grammar point or a lexical area, and the objective is not to ?learn the structure? but to ?complete the task?. Of course, to complete the task successfully students have to use the right language and communicate their ideas. The language, therefore becomes an instrument of communication, whose purpose is to help complete the task successfully. The students can use any language they need to reach their objective. Usually there is no ?correct answer? for a task outcome. Students decide on their own way of completing it, using the language they see fit.

Different teachers use TBL in different ways. Some integrate it into the existing syllabus, some use it to replace the syllabus altogether, some use it as an ?extra? to their traditional classroom activities. But generally, teachers using a TBL approach divide their task-based classes into three stages:

Stage 1: The pre-task. The teacher introduces the topic and familiarizes students with situations/lexical areas/texts (reading and listening)). This draws the students into the topic and brings up language that may be useful. The teacher then explains what the task is and sets up the activity.

Stage 2: Students perform the task in pairs or groups. They may then present their findings/conclusions to the rest of the class. In this stage, mistakes are not important; the teacher provides support and monitors. The learners focus on communication, perhaps at the expense of accuracy, but this will be dealt with in the next stage.

Stage 3: The teacher works on specific language points which come up in stage 2. (During the monitoring stage, most teachers make notes of common errors and students? particular learning needs). Students reflect on the language needed to complete the task and how well they did. This is their opportunity to concentrate on accuracy and make sure they resolve any doubts or problems they had.

Tasks can be as simple as putting a list of animals in order from fastest to slowest and then trying to agree with a partner on the correct order. Or it could be something more complicated like a survey to find out which parts of town your classmates live in and how they get to school, ending in visual information presented in the form of pie charts and maps. Or it could be something really complicated like a role-play involving a meeting in the Town Hall of the different people affected by a new shopping centre development and the consequent demolition of a youth centre and old people?s home. Whatever the task, it should always have some kind of completion; and this completion should be central to the class – the language resulting naturally from the task and not the other way round.

The advantage of TBL over more traditional methods is that it allows students to focus on real communication before doing any serious language analysis. It focuses on students? needs by putting them into authentic communicative situations and allowing them to use all their language resources to deal with them. This draws the learners? attention to what they know how to do, what they don?t know how to do, and what they only half know. It makes learners aware of their needs and encourages them to take (some of the) responsibility for their own learning. TBL is good for mixed ability classes; a task can be completed successfully by a weaker or stronger student with more or less accuracy in language production. The important thing is that both learners have had the same communicative experience and are now aware of their own individual learning needs.

Another advantage of this approach is that learners are exposed to a wide variety of language and not just grammar. Collocations, lexical phrases and expressions, chunks of language, things that often escape the constraints of the traditional syllabus come up naturally in task-based lessons. But this can also be a disadvantage. One of the criticisms of TBL is this randomness. It doesn?t often fit in with the course book/syllabus, which tends to present language in neat packages. Some teachers (and learners) also find the move away from an explicit language focus difficult and anarchistic. Many teachers  also agree that it is not the best method to use with beginners, since they have very few language resources to draw on to be able to complete meaningful tasks successfully.

What is Project-Based Learning (PBL)

The PBL approach takes learner-centredness to a higher level. It shares many aspects with TBL, but if anything, it is even more ambitious. Whereas TBL makes a task the central focus of a lesson, PBL often makes a task the focus of a whole term or academic year.

Again, as with TBL, different teachers approach project work in different ways. Some use it as the basis for a whole year?s work; others dedicate a certain amount of time alongside the syllabus. Some use projects only on short courses or ?intensives?. Others try to get their schools to base their whole curriculums on it. But there are generally considered to be four elements which are common to all project-based activities/classes/courses:

1. A central topic from which all the activities derive and which drives the project towards a final objective.

2. Access to means of investigation (the Internet has made this part of project work much easier) to collect, analyse and use information.

3. Plenty of opportunities for sharing ideas, collaborating and communicating. Interaction with other learners is fundamental to PBL.

4. A final product (often produced using new technologies available to us) in the form of posters, presentations, reports, videos, webpages, blogs and so on.

The role of the teacher and the learner in the PBL approach is very similar to the TBL approach. Learners are given freedom to go about solving problems or sharing information in the way they see fit. The teacher?s role is monitor and facilitator, setting up frameworks for communication, providing access to information and helping with language where necessary, and giving students opportunities to produce a final product or presentation. As with TBL, the teacher monitors interaction but doesn?t interrupt, dealing with language problems at another moment.

The advantages and disadvantages of PBL are similar to those of TBL, but the obvious attraction of project-based learning is the motivating element, especially for younger learners. Projects bring real life into the classroom; instead of learning about how plants grow (and all the language that goes with it), you actually grow the plant and see for yourself. It brings facts to life. The American educational theorist John Dewey wrote ?education is not a preparation for life; education is life itself?.  Project work allows ?life itself? to form part of the classroom and provides hundreds of opportunities for learning. Apart from the fun element, project work involves real life communicative situations, (analyzing, deciding, editing, rejecting, organizing, delegating ?) and often involves multi- disciplinary skills which can be brought from other subjects. All in all, it promotes a higher level of thinking than just learning vocabulary and structures.

Conclusion

Both TBL and PBL focus primarily on the achievement of realistic objectives, and then on the language that is needed to achieve those objectives.  They both treat language as an instrument to complete a given objective rather than an isolated grammar point or lexical set to learn and practise. They give plenty of opportunity for communication in authentic contexts and give the learner freedom to use the linguistic resources he/she has, and then reflect on what they learned or need to learn. Finally, as EFL teachers are eclectic by nature, teachers often use a combination of TBL, PBL and traditional techniques such as PPP. Some teachers use TBL and PBL as a small part of a more conventional approach and many teachers on 100% TBL/PBL courses resort to PP type activities when dealing with grammar or vocabulary problems. As always, the important thing is to use what works best for you and your learners.

by Katherine Bilsborough at British Council BBC.

Team Games to Enhance Critical Thinking

What follows is an article I have read recently about team games at TeachThought.

One of education?s primary goals is to cater for the next generation of little humans to succeed in the ?real world.?

Yes, there are mounds of curricula they must master in a wide breadth of subjects, but education does not begin and end with a textbook or test. Other skills must be honed, too, not the least of which is how to get along with their peers and work well with others. This is not something that can be cultivated through rote memorization or with strategically placed posters.

Students must be engaged and cooperation must be practised, and often. The following team-building games can promote cooperation and communication, help establish a positive classroom environment and ? most importantly ? provide a fun, much-needed reprieve from routine.

Team-Building Games That Promote Collaborative Critical Thinking

1. If You Build it?

This team-building game is flexible. Simply divide students into teams and give them equal amounts of a certain material, like pipe cleaners, blocks, or even dried spaghetti and marshmallows. Then, give them something to construct. The challenge can be variable (think: Which team can build the tallest, structurally-sound skyscraper? Which team can build a house the fastest?).

You can recycle this activity throughout the year by adapting the challenge or materials to specific content areas.

Skills: Communication; problem-solving

2.  Zoom

Zoom is a classic classroom cooperative game that never seems to go out of style. Simply form students into a circle and give each a unique picture of an object, animal or whatever else suits your fancy. You begin a story that incorporates whatever happens to be on your assigned photo. The next student continues the story, incorporating their photo, and so on.

Skills: Communication; creative collaboration

3. Minefield

Another classic team-building game. Arrange some sort of obstacle course and divide students into teams. Students take turns navigating the ?mine field? while blindfolded, with only their teammates to guide them. You can also require students to only use certain words or clues to make it challenging or content-area specific.

Skills: Communication; trust

4. The Worst-Case Scenario

Fabricate a scenario in which students would need to work together and solve problems to succeed, like being stranded on a deserted island or getting lost at sea. Ask them to work together to concoct a solution that ensures everyone arrives safely. You might ask them to come up with a list of 10 must-have items that would help them most, or a creative passage to safety. Encourage them to vote ? everyone must agree to the final solution.

Skills: Communication, problem-solving

5. A Shrinking Vessel

This game requires a good deal of strategy in addition to team work. Its rules are deceptively simple: The entire group must find a way to occupy a space that shrinks over time, until they are packed creatively like sardines. You can form the boundary with a rope, a tarp or blanket being folded over or small traffic cones. (Skills: Problem-solving; teamwork)

6. Go for Gold

This game is similar to the ?If you build it? game: Teams have a common objective, but instead of each one having the same materials, they have access to a whole cache of materials. For instance, the goal might be to create a contraption with pipes, rubber tubing and pieces of cardboard that can carry a marble from point A to point B in a certain number of steps, using only gravity.

Creative collaboration; communication; problem-solving

7. It?s a Mystery

Many children (and grown-ups) enjoy a good mystery, so why not design one that must be solved cooperatively? Give each student a numbered clue. In order to solve the mystery ? say, the case of the missing mascot ? children must work together to solve the clues in order. The ?case? might require them to move from one area of the room to the next, uncovering more clues.

Skills: Problem-solving, communication

8. 4-Way Tug-of-War 

That playground classic is still a hit ? not to mention inexpensive and simple to execute. For a unique variation, set up a multi-directional game by tying ropes in such a way that three or four teams tug at once. Some teams might choose to work together to eliminate the other groups before going head-to-head.

Skills: Team work; sportsmanship

9. Keep it Real

This open-ended concept is simple and serves as an excellent segue into problem-based learning. Challenge students to identify and cooperatively solve a real problem in their schools or communities. You may set the parameters, including a time limit, materials and physical boundaries.

Skills: Problem-solving; communication

by  Aimee Hosler at TeachThought